How to analyze the Workload

Once a scenario has been played, it is possible to analyze the workload of the Projects and Business Cases (within the scenario) if they run as scheduled.

  1. Log in to the HTML5 client.

  2. Select the Portfolio Simulation workspace.

  3. Select a Portfolio Folder in the Data Selector.

  4. Run a scenario by clicking on the Play Scenario (GreenCheck.png) button.

  5. Select the Analytics (viewmode_activescenarios22_md.png) view mode.

  6. In the Workload sub-tab, analyze data displaying the time-distributed Total Effort and Availability for the selected Portfolio Folder(s).

    Note

    Deactivating the switch button on the left-hand side of the Project's Name will exclude the Project from the scenario.

  7. In the Charts sub-tab, select the Workload folder to analyze the workload.

  8. Click on the BACK TO SCENARIO LIST to go back to the Home Page.