How to indicate a Task as Billable

As not all the tasks are Billable, you need to indicate whether or not each Task is Billable.

  1. Log in to the HTML5 client.

  2. Select the Projects Center workspace and open the Project Card.

  3. Select the Billing tab.

  4. Select the Grid mode (viewmode_activegridtable22_md.png).

  5. Activate the Billable switch button for the tasks that are to be marked as Billable.

Tip

Once the Billable Tasks are identified, you can take advantage of the “Billable Tasks Only” option, available in the main toolbar to filter the spreadsheet.