How to edit a Contract

Warning

Only contracts that are not locked (a.k.a. Closed) can be edited.

  1. Log in to the HTML5 client.

  2. Select the Projects Center workspace and open the Project Card.

  3. Select the Administration tab, Connections sub-tab.

  4. In the Connection card, click on the ShowHide button to open the Contract Details dialog box.

  5. Modify the Contract as needed.

  6. Close the dialog box.