CC Save Baseline

When a project’s Schedule Method is set to “Critical Chain”, the baseline specific to the Critical Chain becomes available (in Tracking Mode only). When saving this Baseline, the user can access specific options to take into account a margin of safety.

When clicking on the Critical Chain (ConnectionsGrey) icon of the Gantt toolbar, the following commands can be displayed:

  • CC Save Baseline – Displays the built-in Save Critical Chain Baseline dialog box, allowing the user to choose which Baseline should be saved and to select the corresponding options.

  • CC Remove Baseline – Displays the built-in Remove Baseline(s) dialog box, allowing the user to select which Baselines should be removed.