Project Allocations full screen view

Requests tab

Filters panel

The Filters panel allows the user to narrow down the list of displayed Allocation Requests in both the Requests Inbox and Requests Overview sub-tabs.

The Filters panel can be displayed or hidden using the following buttons:

FilterGrey

Show

Allows the user to display the panel.

When some filters are active, the icon is displayed in blue.

close22_md.png

Close

Allows the user to hide the panel.

The following filtering options are available:

Organizations

Allows the user to display only Allocation Requests whose Organization has been selected.

Job Classifications

Allows the user to only display Allocation Requests whose Job Classification has been selected.

Skills

Allows the user to only display Allocation Requests whose Skills have been selected.

Workflow States

Allows the user to only display Allocation Requests whose Workflow State has been selected.

Task Allocation Status

Allows the user to only display Allocation Requests whose corresponding Task Allocation Status is either “Pending” or “Answered”.

Display Requests

Allows the user to display Allocation Requests that have been created at the Project level, Task level, or both.

Display requests with effort only

Allows the user to only display Allocation Requests whose Requested Effort > 0 for the selected time period.

In addition, the following alert-related filters are available:

notesNewUnread22_md.png

New Notes

Indicates the number of Requests with unread Notes.

To_do.png

To Do

Indicates the number of Requests whose Workflow State is “Working”, “Rejected”, or “Reworked”.

CalendarGrey

Due Soon

Indicates the number of open Requests whose Start Date (i.e., first date on which the Requested Effort > 0) falls within the Allocation Request Due Date Alert period.

Settings

The Allocation Request Due Date Alert period is defined by the Administrator with the “Allocation Request Problem Granularity” setting available in the System Settings workspace, Resource Settings folder, Allocations & Commitments tab, Allocations Options section.

ExclamationPointFullRed

Overdue

Indicates the number of open Requests whose Start Date (i.e., first date on which the Requested Effort > 0) falls before Today’s date.

To_be_Accepted_2x.png

To Be Accepted

Indicates the number of open Requests whose Workflow State is “Answered”.

Not_Synchronized_2x.png

Not Synchronized

Indicates the number of Task Allocation Requests whose Requested Effort is not aligned with the Labor Assignments Total Effort (Soft Assignments or Hard Assignments, depending on the status of the request).

Settings

This alert is only available when the Administrator has activated the “Enable Convert Assignment into Request” setting available in the System Settings workspace, Resource Settings folder, Allocations & Commitments tab, Allocations Options section.

The user can also take advantage of the Show Closed (ShowHide) display option located in the top of the panel to display or hide Allocation Requests considered as Closed (i.e., Requests that have reached their final Workflow State, or Requests whose legacy “Closed” field has been set to yes).

Clicking on the Reset button located in the bottom right corner of the panel sets all the filters back to their default value.

Requests Inbox sub-tab

The Requests Inbox sub-tab allows the user to review the selected project Allocation Requests individually, and in a detailed manner.

PMRequestsInbox.png

The Requests Inbox sub-tab is made up of:

  1. The Requests List panel, which allows the user to select the Allocation Request whose details are to be displayed.

  2. The Request Details view, whose display varies depending on the status of the Request.

Requests List panel

The Requests List panel displays the list of Allocation Requests for the selected project.

Settings

The number of elements displayed is conditioned by the "Set Inbox Number of Cards" setting available in the System Settings workspace, General Settings folder, Global Options tab.

The following display options are provided at the top of the panel for the user to manage the list:

Group By

Allows the user to group the list of Allocation Requests by Workflow State (default), Organization, or Job Classification.

Sort By

Allows the user to sort the Allocation Requests by Start Date (default), or Priority.

Clicking on the Add Request (alert_close22.png) button opens the Create Allocation Request dialog box, allowing the user to create a new Allocation Request at the project level.

Each Allocation Request is displayed in the form of a card providing the following Allocation Request attributes: Task Name (if any, otherwise the “Requested on” date), Workflow State, Organization, and Job Classification.

Note

The “Requested on” date is defined as follows:

  • Request creation date, if the Allocation Request was created in Sciforma 2021.07 version or higher.

  • Request Start Date (i.e., first date on which the Requested Effort > 0) for legacy requests.

Upon clicking on the Task Name or the requested date for a given Allocation Request, the details regarding the corresponding request are displayed in the right-hand side of the view.

Selected Request Header

The upper section of the header provides the following reminders regarding the selected project: Name (followed by the request’s Task or Requested date), and Manager 1.

PMRequestHeader.png

The user can access the dialog boxes for more information:

Cost Impacts

Opens the Cost Impacts popup, allowing the user to review the impacts of the requests on the selected project’s cost.

Project Brief

Opens the corresponding Project Brief dialog box.

The following information regarding the Allocation Request is available in the header:

Organization & Job Classification

Indicates the Organization and Job Classification required for the Allocation.

Skills

Indicates the Skills required for the Allocation.

Suggested Resources

Displays the name of the suggested resource (if only one), or indicates that multiple resources have been suggested for the request.

Planning

Indicates the Start and Finish dates for the request (i.e., the first and last dates for which the Requested Effort > 0).

Priority

Indicates the level of priority for the Allocation Request (default value: 50).

Note

The lower the number, the more important the request.

In addition to the Allocation Request Workflow State, the right-most section of the header provides the following tools:

notesUnread22_md.png

Notes

Indicates whether or not there are new notes, and opens the Notes dialog box.

MoreVertical

More

Provides access to the following commands:

WorkflowAction

Workflow Actions

Allows the user to modify the Workflow State Vote associated with the Allocation Request.

Request Details section

If no Allocation has been created yet for the selected Request, the Details section only displays a time-distributed spreadsheet showing the Requested Effort.

PMRequestDetails.png

The Requested Effort is editable if the Allocation Request Workflow State is “Working”, “Rejected”, or “Reworked”.

Once some allocations are attached to the Allocation Request, additional information regarding the soft and hard allocations, as well as the gap between the Allocated and Requested Effort will be displayed.

The following tools are available for Hard Allocations:

AddResources

Assign

Provides access to the following commands:

  • Quick Assign – If the Request is created at the Project level, the user is prompted to select the Task the Resource will be assigned to, and to select whether the assignment should be done in a Uniform way (based on the default rate) or Non-Uniform way (based on the Allocated Effort). If the Request is created at the Task Level, the request will be accepted and the corresponding soft assignment is fulfilled with the resource upon clicking on the command.

  • Assign/Fulfill from Allocation – Opens the Assign from Allocation dialog box.

ProjectTeam

Add to Project Team

Allows the user to add the corresponding resource to the selected project Team.

This command is displayed instead of the Assign button only available when the resource is not yet part of the team. In other words, the user needs to add the resource to the project team in order to be able to assign it.

notesUnread22_md.png

Notes

Indicates whether or not there are new notes, and opens the Notes dialog box.

Matching Soft Assignments section

This read-only spreadsheet provides a list of existing soft assignments that match the current request attributes (i.e., Organization, Job Classification, and Skills). To be displayed in the list, the soft assignments also need to have some Effort values entered in the selected time period.

The following tools are provided with the spreadsheet:

LoopGrey

Sync Requested Effort

Allows the user to update the selected Allocation Request Requested Effort with the values of the existing Soft Assignments Total Effort values.

MoreVertical

More

Provides access to the following commands:

Allocated Resources Assignments section

The Allocated Resources Assignments section displays, for the resources allocated to the request, the existing Hard Assignments already created over the selected period.

The spreadsheet provides the following tools:

scrollintoview_monochrome22_md.png

Scroll Into View

Scroll to the first date with Effort > 0 among all the Assignments.

AddResources

Assign Allocated Resources

Allows the user to assign the Allocated Resources to the project Tasks. Upon clicking on this command, the user is prompted to select one or multiple Tasks.

Details

Opens a popup with content similar to that found in the Resource Allocation Details view available in the Allocations tab, Resource Details sub-tab.

Uniform

Uniform

Indicates that only uniform assignment is allowed.

Non Uniform

Non-Uniform

Indicates that non-uniform assignment is allowed.

MoreVertical

More

Provides access to the following commands:

  • Edit Task – Opens the corresponding Task Details dialog box.

  • Edit Assignment – Opens the corresponding Labor Assignment dialog box.

  • Delete Assignment – Allows the user to delete the corresponding Labor Assignment.

  • Scroll Into View – Scrolls to the first date in the timeframe with Effort > 0.

Colored indicators are provided to highlight the % shift between the resources Usable Effort and Total Effort. The user can access the legend of the colored indicators by clicking on the Legend (Legend) button located in the bottom right corner of the view.

Settings

Colored Indicators are defined by the Administrator in the System Settings workspace, General Settings folder, Colored Indicators tab, Resource Utilization Preferences.

Requests Overview sub-tab

The Requests Overview sub-tab provides a list of the selected project’s Allocation Requests for the selected time frame.

PMRequestsOverview.png

In addition to the Time Navigation toolbar, the following display options are available:

GroupBy

Group By

Allows the user to group the requests by Organization (default), Job Classification, or Parent (Project and related Tasks, when relevant).

ShowHide

Show Allocations

Allows the user to display the Allocations associated with the Allocation Requests (if any).

For each Request, the following attributes are displayed: Name, Organization, Job Classification, Skills, Workflow State, and Priority, along with the time-distributed Requested Effort.

Colored Indicators are provided to highlight the % shift between the Requested Effort and the Allocated Effort. The user can access the legend for the colored indicators by clicking on the Legend (Legend) button located in the bottom right corner of the view.

Settings

Colored Indicators are defined by the Administrator in the System Settings workspace, General Settings folder, Colored Indicators tab, Resource Utilization Preferences.

The spreadsheet provides the following tools to manage the requests:

NewProject

New

Opens the Create Allocation Request dialog box.

DeleteRed

Delete

Allows the user to delete the selected Allocation Request(s).

This command is only available if at least one Allocation Request is selected (i.e., the corresponding checkbox is ticked).

assignResource22_md.png

Build

Opens the Build Allocation Requests dialog box, allowing the user to create Allocation Requests from existing Soft Assignments. This command is only available if at least one Soft Assignment exists for the selected project.

Copy

Duplicate

Allows the user to create a copy of the selected Allocation Request(s).

This command is only available if at least one Allocation Request is selected (i.e., the corresponding checkbox is ticked).

Submit

Submit the selected Requests

Allows the user to send the selected Requests to the Resource Manager (if Requests Workflow State is "Working").

ShiftData

Shift Data

Allows the user to postpone (or bring forward) the selected time-distributed values.

This command is only available if at least one Allocation Request is selected (i.e., the corresponding checkbox is ticked).

clearselection22_md.png

Clear Selection

Allows the user to deselect all the elements in the spreadsheet.

notesUnread22_md.png

Notes

Indicates whether or not there are new notes, and opens the Notes dialog box.

MoreVertical

More

Provides access to the following commands:

  • Edit – Opens the Edit Allocation Request dialog box.

  • Accept Allocation – Allows the user to set the Allocation Request Workflow State to “Accepted”, when relevant. This command is only available for an Allocation Request created at the Task level, and if there is an Allocation associated with the Allocation Request.

  • Duplicate – Creates a copy of the corresponding Allocation Request.

  • Delete – Allows the user to delete the corresponding Allocation Request.

  • Scroll Into View – Scrolls to the first date with Requested Effort > 0 for the corresponding Request.

In addition, when the Show Allocations (ShowHide) display option is activated, the following tools are available for each Allocation row upon clicking on the More (MoreVertical) button:

View Details

Opens a read-only version of the Allocation Details dialog box.

Quick Assign

If the Request is created at the Project level, the user is prompted to select the Task the Resource will be assigned to, and to select whether the assignment should be done in a Uniform way (based on the default rate) or Non-Uniform way (based on the Allocated Effort).

If the Request is created at the Task Level, the request will be accepted and the corresponding soft assignment is fulfilled with the resource upon clicking on the command.

Match and Fulfill

Opens the Assign from Allocation dialog box.

Scroll Into View

Scrolls to the first date with Allocated Effort > 0 for the corresponding Allocation.

Allocations tab

Resource Details sub-tab

The Resource Details sub-tab allows the user to review the selected project Allocated Resources individually and in a detailed manner.

The Resource Details sub-tab is made up of:

  1. The Filters panel, which can be hidden or displayed depending on the user’s needs.

  2. The Resources List panel, which allows the user to select the Allocated Resource whose detailed information is to be displayed.

  3. The Resource Allocation Details view, which provides information regarding the selected resource’s allocations and assignments.

Filters panel

The Filters panel allows the user to narrow down the list of displayed Allocated Resources found in the Resources List panel.

The Filters panel can be displayed or hidden using the following buttons:

FilterGrey

Show

Allows the user to display the panel.

When some filters are active, the icon is displayed in blue.

close22_md.png

Close

Allows the user to hide the panel.

The following filtering options are available:

Organizations

Allows the user to display only Allocated Resources whose Organization has been selected.

Job Classifications

Allows the user to only display Allocated Resources whose Job Classification has been selected.

Skills

Allows the user to only display Allocated Resources whose Skills have been selected.

Contract Type

Allows the user to only display Allocated Resources whose Contract Type is "Internal" or "External".

Resources

Allows the user to only display specific Allocated Resources.

Show Inactive Resources

Allows the user to display resources whose Status is “Inactive”.

In addition, the following alert-related filters are available:

notesNewUnread22_md.png

New Notes

Indicates the number of Allocations with unread Notes.

Underassigned__2_.png

Underassigned

Indicates the number of Allocated Resources whose Total Effort value (from the Assignments) falls below the Usable Effort value for the current period (according to the selection made in the Time Navigation toolbar).

Overassigned__2_.png

Overassigned

Indicates the number of Allocated Resources whose Total Effort value (from the Assignments) is greater than the Usable Effort value for the current period (according to the selection made in the Time Navigation toolbar).

TriangleAmber

Not Assigned

Indicates the number of Allocated Resources with no Hard Assignment on the selected project.

ProjectTeam

Not in Project Team

Indicates the number of Allocated Resources that are not yet in the Project Team.

AddRoundGreen

Recently Created

Indicates the number of Project Allocations whose creation date falls within the Allocation Request Due Date Alert period.

Settings

The Allocation Request Due Date Alert period is defined by the Administrator with the “Allocation Request Problem Granularity” setting available in the System Settings workspace, Resource Settings folder, Allocations & Commitments tab, Allocations Options section.

Recently_Updated_2x.png

Recently Updated

Indicates the number of Project Allocations that were last modified during the Allocation Request Due Date Alert period.

Settings

The Allocation Request Due Date Alert period is defined by the Administrator with the “Allocation Request Problem Granularity” setting available in the System Settings workspace, Resource Settings folder, Allocations & Commitments tab, Allocations Options section.

Clicking on the Reset button located in the bottom right corner of the panel sets all the filters back to their default value.

Resources List panel

The Resources List panel displays the list of Allocated Resources for the selected project.

ResourcesList.png
Settings

The number of elements displayed is conditioned by the "Set Inbox Number of Cards" setting available in the System Settings workspace, General Settings folder, Global Options tab.

The Group By (GroupBy) display option allows the user to group the list by Organization (default), Job Classification, or Contract Type.

Each Allocated Resource is displayed in the form of a card featuring the following information: Resource Picture, Name, and Job Classification (or Organization if the Group By option is set to "Job Classification").

In addition, colored indicators are provided to highlight the % shift between the Usable Effort and the Total Effort (from the assignments) for a selected time period.

Settings

Colored Indicators are defined by the Administrator in the System Settings workspace, General Settings folder, Colored Indicators tab, Resource Utilization Preferences.

If the resource is not part of the Project Team yet, the Not in Project Team (ProjectTeam) icon will be available instead of the indicator.

NotInProjectTeam.png

Resource Allocation Details view

The Details section header provides the following information regarding the selected resource: Picture, Name, Job Classification, and Organization.

In addition, the following commands are available in the right-hand side of the view:

Resource Brief

Opens the corresponding Resource Brief dialog box.

Add to Team

Allows the user to add the selected resource to the Project Team.

This command is only available if the resource does not yet belong to the Project Team.

The Allocations time-distributed spreadsheet displays the Total Allocation and the Remaining Usable Effort of the resource, followed by the details of the Allocations, classified as follows:

  • Direct Allocations (i.e., allocations not linked to a request) – Only one direct allocation is possible per resource per project.

  • Confirmed Allocations – Allocations whose corresponding Allocation Request has reached its final Workflow State (by default, “Accepted”).

  • Pending Allocations – Allocations whose corresponding Request has not reached the final Workflow State yet.

Important

Allocated Effort from Pending Allocations is not taken into account in the resource’s Usable Effort.

Highlighted cells are displayed to emphasize the Task (or Project) boundaries.

Note

If the logged-in user is both the Project Manager and the Resource Manager, the Allocations will be editable directly in the spreadsheet.

The following tools are available to manage the allocations:

notesUnread22_md.png

Notes

Indicates whether or not there are new notes, and opens the Notes dialog box.

MoreVertical

More

Provides access to the following commands:

The Resources Assignments section is displayed as soon as the selected resource becomes part of the project team.

The Add Assignment (alert_close22.png) button provides the following commands to create assignments for the selected resource:

Quick Assign

If the Allocation is created at the Project level, the user is prompted to select the Task the Resource will be assigned to, and to select whether the assignment should be done in a Uniform way (based on the default rate) or Non-Uniform way (based on the Allocated Effort).

If the Allocation is created at the Task Level, the request will be accepted and the corresponding soft assignment is fulfilled with the resource upon clicking on the command.

Assign/Fulfill from Allocation

Opens the Assign from Allocation dialog box.

Upon clicking on the More (MoreVertical) button on the Labor Assignment row, the following commands are available:

Edit Assignment

Opens the Labor Assignment dialog box.

Edit Task

Opens the Task Details dialog box.

Delete Assignment

Allows the user to delete the corresponding assignment.

Scroll Into View

Scrolls to the first date with Allocated Effort > 0 for the corresponding Allocation.

Resources Overview sub-tab

The Resources Overview sub-tab provides a list of the selected project's Allocations for the selected time frame.

Filters panel

The Filters panel allows the user to narrow down the list of Allocated Resources displayed in the spreadsheet.

The Filters panel can be displayed or hidden using the following buttons:

FilterGrey

Show

Allows the user to display the panel.

When some filters are active, the icon is displayed in blue.

close22_md.png

Close

Allows the user to hide the panel.

The following filtering options are available:

Organizations

Allows the user to display only Allocated Resources whose Organization has been selected.

Job Classifications

Allows the user to only display Allocated Resources whose Job Classification has been selected.

Skills

Allows the user to only display Allocated Resources whose Skills have been selected.

Contract Type

Allows the user to only display Allocated Resources whose Contract Type is "Internal" or "External".

Resources

Allows the user to only display specific Allocated Resources.

Generic Resources

Allows the user to only display data regarding the selected Generic Resource(s).

Show Allocations

Allows the user to display Hard Allocations, Soft Allocations, or Both.

Show Inactive Resources

Allows the user to display resources whose Status is “Inactive”.

Display Allocations with Effort Only

Allows the user to only display allocations whose Allocated Effort is > 0 for the selected time period.

Resources with Upcoming Non-Working Days only

Allow the user to only display resources with at least one non-working day in the upcoming period.

Allocations Starting Soon only

Allows the user to only display Allocations whose Start Date (i.e., first date on which the Allocated Effort > 0) falls within the upcoming period.

Allocations Finishing Soon only

Allows the user to only display Allocations whose Finish Date (i.e., last date on which the Allocated Effort > 0) falls within the upcoming period.

Settings

The upcoming period considered in the Upcoming Events panel is defined by the Administrator using the “Upcoming Events Granularity (days)” setting available in the System Settings workspace, Resource Settings folder, Allocations & Commitments tab, Allocations Options section.

In addition, the following alert-related filters are available:

notesNewUnread22_md.png

New Notes

Indicates the number of Allocations with unread Notes.

Underassigned__2_.png

Underassigned

Indicates the number of Allocated Resources whose Total Effort value (from the Assignments) falls below the Usable Effort value for the current period (according to the selection made in the Time Navigation toolbar).

Overassigned__2_.png

Overassigned

Indicates the number of Allocated Resources whose Total Effort value (from the Assignments) is greater than the Usable Effort value for the current period (according to the selection made in the Time Navigation toolbar).

TriangleAmber

Not Assigned

Indicates the number of Allocated Resources with no Hard Assignment on the selected project.

ProjectTeam

Not in Project Team

Indicates the number of Allocated Resources that are not yet in the Project Team.

AddRoundGreen

Recently Created

Indicates the number of Project Allocations whose creation date falls within the Allocation Request Due Date Alert period.

Settings

The Allocation Request Due Date Alert period is defined by the Administrator with the “Allocation Request Problem Granularity” setting available in the System Settings workspace, Resource Settings folder, Allocations & Commitments tab, Allocations Options section.

Recently_Updated_2x.png

Recently Updated

Indicates the number of Project Allocations that were last modified during the Allocation Request Due Date Alert period.

Settings

The Allocation Request Due Date Alert period is defined by the Administrator with the “Allocation Request Problem Granularity” setting available in the System Settings workspace, Resource Settings folder, Allocations & Commitments tab, Allocations Options section.

Clicking on the Reset button located in the bottom right corner of the panel sets all the filters back to their default value.

Main view

The Allocations spreadsheet lists all the project’s soft and hard allocations with some effort in the selected time period.

The user can take advantage of the Time Navigation toolbar as well as the following display options:

GroupBy

Group By

Allows the user to group the view by Organization (default), Job Classification, or Contract Type.

ShowHide

Remaining Usable Effort

Allows the user to display or hide the Remaining Usable Effort row for each resource.

The toolbar provides the following commands:

addresourceblue22_md.png

Assign

Prompts the user to select the Task the Resource will be assigned to, and to select whether the assignment should be done in a Uniform way (based on the default rate) or Non-Uniform way (based on the Allocated Effort).

This command is only available when at least one resource is selected (i.e., the corresponding checkbox is ticked).

addresourcered22_md.png

Add to Project Team

Allows the user to add the selected resource(s) to the Project Team.

clearselection22_md.png

Clear Selection

Allows the user to deselect all the elements in the spreadsheet.

Upon clicking on the More (MoreVertical) button of a Hard Allocation, the following commands are available:

Add to Project Team

Allows the user to add the selected resource to the Project Team.

This command is only available if the resource does not yet belong to the Project Team.

Quick Assign

If the Allocation is created at the Project level, the user is prompted to select the Task the Resource will be assigned to, and to select whether the assignment should be done in a Uniform way (based on the default rate) or Non-Uniform way (based on the Allocated Effort).

If the Allocation is created at the Task Level, the request will be accepted and the corresponding soft assignment is fulfilled with the resource upon clicking on the command.

Assign/Fulfill from Allocation

Opens the Assign from Allocation dialog box.

Scroll Into View

Scrolls to the first date with Allocated Effort > 0 for the corresponding Allocation.

In addition, clicking on the Details button for a specific resource opens a popup with the same content as that found in the Allocations tab, Resource Details view (focused on the selected resource).

Upon clicking on the More (MoreVertical) button of a Soft Allocation, the following commands are available:

View Details

Opens the Allocation Details dialog box.

Scroll Into View

Scrolls to the first date in the timeframe with Allocated Effort > 0 for the corresponding Allocation.

In addition, clicking on the Spreadsheet button in the upper right corner of the view opens the Allocation Details popup, which provides content similar to that found in the Resources Overview sub-tab but in the format of a flat list.

My Allocated Resources sub-tab

The My Allocated Resources sub-tab is displayed for users who are both the Manager of the selected project and a Resource Manager. It aims at providing him/her the necessary tools to directly manage the Allocations of resources belonging to the Organization(s) he/she manages, without leaving the project context.

Display Options

The Filters popup provides the following filtering options:

Organizations

Allows the user to display only Allocated Resources whose Organization has been selected.

Job Classifications

Allows the user to only display Allocated Resources whose Job Classification has been selected.

Skills

Allows the user to only display Allocated Resources whose Skills have been selected.

Contract Type

Allows the user to only display Allocated Resources whose Contract Type is "Internal" or "External".

Resources

Allows the user to only display specific Allocated Resources.

Show Inactive Resources

Allows the user to display resources whose Status is “Inactive”.

In addition, the Group By (GroupBy) display option allows the user to group the Resources by Organization (default), Job Classification, or Contract Type.

My Allocated Resources spreadsheet

The My Allocated Resources time-distributed spreadsheet displays the Allocations information as follows:

  • Direct Allocations (i.e., allocations not linked to a request) – Only one direct allocation is possible per resource per project.

  • Confirmed Allocations – Allocations whose corresponding Allocation Request has reached its final Workflow State (by default, “Accepted”).

  • Pending Allocations – Allocations whose corresponding Request has not reached the final Workflow State yet.

The following tools are provided in the view to manage the allocations:

AddResources

New Hard Allocation

Allows the user to create a new Hard Allocation.

assignResource22_md.png

Update Allocations

Opens the Update Allocations from Assignments dialog box.

DeleteRed

Delete

Allows the user to delete the selected Allocation.

This command is only available when at least one allocation is selected (i.e., the corresponding checkbox is ticked).

clearselection22_md.png

Clear Selection

Allows the user to deselect all the elements in the spreadsheet.

Brief

Opens the corresponding Resource Brief dialog box.

MoreVertical

More

Provides access to the following commands: 

  • View Allocation Details – Opens the Allocation Details dialog box.

  • Edit Request – Opens the Edit Allocation Request dialog box. This command is only available for Allocations linked to requests.

  • Delete Allocation – Allows the user to delete the corresponding Allocation.

  • Scroll Into View – Scrolls to the first date with Allocated Effort > 0 for the corresponding Allocation.

In addition, clicking on the Spreadsheet button in the upper right corner of the view opens the My Allocated Resources Details popup, which provides content similar to that found in the My Allocated Resources sub-tab but in the format of a flat list.