How to check Resource Shifts

Note

To proceed to this action, the Save baseline 10 before leveling option in the Resolve Resource Contention dialog box should have been selected upon defining the Critical Chain.

  1. Log in to the HTML5 client.

  2. Select the Work workspace, Gantt tab.

  3. Select a project in the Project Data Selector.

  4. Click on the Critical Chain (ConnectionsGrey) button, and select the Check Resource Shifts (Baseline 10) command.

  5. Check Resource Shifts in the Resource Shifts with Baseline 10 popup.

  6. Close the popup.